bst365最新正规买球

Functional Packaging Leader

Monday to Saturday8:00-18:00

0757-8116 2395

Your position:Customer service - Common problem

Free service hotline:

0757-8116 2395

Fax:0757-8116 2399

Add:No.2, Kewang Road, zone a, science and Technology Industrial Park, Shishan town, Nanhai District, Foshan City, Guangdong Province

E-mail:huihong@dfgwww.cn

Common problem

When the product is just turned on, the product runs away. The reasons for the lack of glue after a

Announcer:Huihong   Addtime:2020-02-18

Solution: The melt in the injection tube of the injection molding machine has a long heating time, low melt viscosity, and good fluidity when the machine is just turned on. The product is easy to run, and after a period of production, the melt continuously removes the heat, causing the melt. Insufficient, high viscosity, poor fluidity, making the product lack of glue.

After a period of production, gradually increase the temperature of the tube to solve.

Related news

2thKewang Rd.,Shishan Industrial Park Area A,Nanhai District,Foshan,Guangdong,China Post Code 528200

+86-757-81162396 81162395

huihong@dfgwww.cn

Follow us

Copyright © 2020 Foshan Huihong Plastic Mould Co., Ltd. All Rights Reserved. Technical Support: